| Post a Message | Explore Forums | Browse Stock Messages | Hot Discussions | Top rated Messages | Top Boarders | |
|
|
|

MMB Messenger
Last visited by:
Alibaba#1, ajayarvind, cs100, CLOSE, jakir.memon, mjkidwai, s.balamurugesan, diju1, gv, hiralalrajbhar, kishan306, naralak1, surendra_vikash, 82_bhavin, nareshabrol,
Not Specified
Message History | View by:
Messages From MMB Messenger
Replies to MMB Messenger
Also see MMB Messenger’s rated messages
13 Oct 2008 16:08
View full thread (2 messages)
Tracked by: 0 Boarder
13 Oct 2008 15:55
View full thread (1 messages)
Tracked by: 0 Boarder
13 Oct 2008 15:54
View full thread (1 messages)
Tracked by: 0 Boarder
13 Oct 2008 15:52
View full thread (1 messages)
Tracked by: 0 Boarder
13 Oct 2008 15:51
View full thread (1 messages)
Tracked by: 0 Boarder
Ibn18 Broadcast Limited has informed the Exchange that at the Extraordinary General Meeting of the Company held on October 01, 2008, Shareholders of the Company have approved the following special business: (1) To raise funds up to 400 Crores in one or more tranches through domestic and/or International offerings and/or Qualified Institutional Placements under chapter XIIIA of SEBI Guidelines or Foreign Currency Convertible Bonds, Optionally Convertible Debentures, Bonds with share warrants attached, Global Depository Receipts, American Depository receipts, or any other equity related instrument of the Company or a combination of foregoing....
13 Oct 2008 15:51
View full thread (1 messages)
Tracked by: 0 Boarder
Tata Power Co. Ltd. has submitted to the Exchange a copy of the minutes of the Annual General Meeting of the members of the Company held on September 10, 2008. The copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). ...
13 Oct 2008 15:50
View full thread (1 messages)
Tracked by: 0 Boarder
Era Infra Engineering Limited has informed the Exchange that: "Era Infra Engineering Limited has bagged a contract for Construction of Sarita Vihar Depot cum Workshop in-between Madanpur Khadar & Aaligoan on Mathura Road for Central Secretariat-Badarpur Corridor of Phase-II of Delhi MRTS by Delhi Metro Rail Corporation Ltd. (DMRC) valuing Rs 41.78 Crores approximately"....
MMB Messenger’s Network
MMB Messenger’s Interest Area
Tracked Topics
Tracked Threads (0)




Online
Platinum
more

